Overview
StatusOperational
OwnerCity of Tampa
LocaleTampa, Florida
Termini
Stations11[1]
WebsiteTECO Line Streetcar
Service
TypeHeritage streetcar
SystemHART
Services1[1]
Operator(s)HART
Rolling stockBirney
Daily ridership2,500[2]
History
OpenedOctober 19, 2002
Technical
Line length2.7 mi (4.35 km)[3]
CharacterAt-grade
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
ElectrificationOverhead line600 V DC[4]
1900's Tampa streetcar route maps
image icon Original 1920-40s (tampaheights.org)
image icon 1920's Modern Redraw (Jake Berman)
Route diagram

Centennial Park
Hillsborough Area Regional Transit
Centro Ybor
Hillsborough Area Regional Transit
Streetcar Society
Cadrecha Plaza
Hillsborough Area Regional Transit
MetroRapid
Publix
York Street
Cumberland Avenue
Whiting
Hillsborough Area Regional Transit
Amalie Arena
Hillsborough Area Regional Transit Tampa Bay Area#Water
HSBC
Hillsborough Area Regional Transit Tampa Bay Area#Water
Dick Greco Plaza
Hillsborough Area Regional Transit Tampa Bay Area#Water

Disabled access All stations are accessible

The TECO Line Streetcar is a heritage streetcar transit line in Tampa, Florida, run by the Hillsborough Area Regional Transportation Authority (HART), owned by the city of Tampa, and managed by Tampa Historic Streetcar, Inc. It connects Downtown and Channelside to the historic Ybor City district. There is also an "In-Town" trolley-replica bus system that connects Downtown, Channelside, and Harbour Island.[1]

The line opened on October 19, 2002, at 2.4 mi (3.86 km) long, and expanded to 2.7 mi (4.35 km) in 2010,[5] with 11 stations.[1] The system is single-track with several passing sidings, which mostly follows a reserved right-of-way at a cost of 13.7 million per mile. Ten replica historic streetcars and one restored historic streetcar are used on the line. The replica cars themselves cost $745,000 each. A $2.7 million grant from the Florida Department of Transportation awarded in 2018 allowed HART to eliminate fares and increase frequency on the line, causing a significant increase in ridership.[6]

Despite a $67 million state grant, a proposed expansion to 4.0 miles (6.4 km) and 6 more stations has faced funding issues.[7][8] A county tax to help pay for the development was ruled unconstitutional by the Supreme Court of Florida in 2021 after being passed locally.[9]

First streetcars in Tampa[edit]

Locomotive and cars of the Tampa Street Railway in early 1890s

The first streetcars in Tampa were operated by the Tampa Street Railway Company between downtown Tampa and Ybor City. The line started operation in 1885, using wood-burning steam engines. In 1892 the Tampa Street Railway Company merged with the Florida Electric Company to form the Tampa Street Railway and Power Company, and converted to electrically powered streetcars in 1893. Also in 1892, a rival company, the Tampa Suburban Company, was organized to compete with the Tampa Street Railway Company, but was blocked from operating by an injunction. A new company, The Consumers Electric Light and Street Railway Company was formed, and soon out-competed the Tampa Railway Company by lowering its fares. The Consumers Electric Light and Street Railway Company bought out the Tampa Street Railway Company in 1894. The company also acquired control of the Tampa and Palmetto Beach Rail Company, becoming the sole streetcar operator in Tampa. The Tampa Electric Company acquired control of the Consumers Electric Light and Street Railway Company in 1899.[10][11]

Streetcar approaching Lafayette St. bridge, from in front of Plant Park, 1918
Grand Central Avenue (now Kennedy Boulevard) near the Tampa Bay Hotel, August, 1925

The Tampa Electric Company acquired 21 miles (34 km) of streetcar track with the Consumers Electric Light and Street Railway Company in 1899. After acquiring the Tampa and Sulphur Springs Traction Company in 1913, Tampa Electric had almost 50 miles (80 km) of track, increasing to 53 miles (85 km) by 1926. That year the Tampa Electric system carried almost 24 million passengers.[12]

August, 1924

The streetcar system in Tampa was extensive, maps shown here & here, with at least 13 different connected lines. Each line ran anywhere from every 10 to 30 minutes, from around 5 am till midnight.[13][14] It was shut down after World War Two, with the city tearing up most of the already installed tracks.[13] The last cars were removed from service some time between 1946 and 1949.[15]

Revival[edit]

Replica of a Birney Safety Car in Tampa
One of the streetcars at Centro Ybor, Ybor City

Streetcars returned to Tampa in 2002, when the initial 2.4 mi (3.86 km) long[3] heritage line was opened. Its operating costs are financed through a special tax assessment (.33 per thousand) on businesses in the streetcar district and a streetcar endowment stemming from settlement money received in 2006 by the city for the demolition of the Harbour Island People Mover.

In its first year of operation, the streetcar carried 420,000 riders, 20% more than projected. In 2005, 434,498 passengers used the streetcar. In 2011, streetcar ridership from October 2011 through May decreased by 8.3 percent to 265,148 with a total for the year of 358,737 riders. In 2015, the streetcar served 285,900 passengers.[2]

A new 0.333 mi (0.54 km) extension,[3] costing $5.5 million, opened for revenue service on December 19, 2010. The extension runs north along Franklin Street to Whiting Street and the Fort Brooke parking garage,[3] connecting the Convention Center as well as the rest of the TECO Line to the downtown core.[16]

Station list[edit]

From north to south, the stations are

Rolling stock[edit]

Interior of one of the replica streetcars
Original Birney-type car 163 just west of Centro Ybor station in 2009

The system originally had had eleven operating streetcars: nine modern replica double-truck Birney cars, one replica open-bench "Breezer" (similar to J.G. Brill cars built for Metropolitan Street Railway of New York), and one restored original Birney car. The replicas were built by the Gomaco Trolley Company in Ida Grove, Iowa. In 2020, the number of operating streetcars was reduced to ten as car #429 was in an accident that damaged it beyond repair. The replica vehicles resemble the originals that were operating in the city from the 1920s to 1946.

The Birney #163, is the fully restored unit and is smaller than the replica models.[17] This streetcar ran on the Tampa & Ybor City Street Railway between 1923 and 1946. It was found in 1991 in Sulphur Springs, a neighborhood in Tampa, where it had been used as an apartment and later a storage shed. Volunteers worked more than 10,000 hours to restore the car to its former condition. It is Florida's only operational historic streetcar.[18][19]

The replica Birney cars have a welded steel body with cosmetic rivets added to make them look older. The cars are wheelchair-accessible, are air-conditioned and offer free WiFi. The seats are made of wood and are reversible for when the car changes direction. The cars are also equipped with on-board ticket dispensers; however, they do not provide change.[20]

Financing[edit]

Map of proposed extension

The agency that operates the streetcar is a non-profit.[21] On October 22, 2014, the Tampa Bay Times published an editorial on the leverage a subsidy the Tampa Port Authority gives to the streetcar system. However it also wrote that the system "is not dependent" on the subsidy. They also reported that the system has to pay almost half a million dollars in insurance to cover the risk of streetcars crossing an active freight rail line.

The single-ride adult fare was $2.50 prior to October 2018.[22] Starting that month, fares were dropped for a three year period due to a grant from the Florida Department of Transportation.[23] As a result, ridership on the 2.7 mile line has skyrocketed, with almost three times as many riders in 2019 as in 2018.[24]

Plenary Americas US Holdings Inc has proposed partnering with the city to build a transit line primarily along Cypress Street - connecting Ybor City, Channelside, Downtown, Midtown, Westshore, and the airport. The new line may be called the CrossTampa Transit Connector with 16 stations and two major multipurpose hubs.[25]

The Florida Department of Revenue awarded $67 million for the streetcar expansion on December 8, 2020. The city hoped the updated and extended streetcar service would be up and running by the end of 2026.[7]

In February 2021 the Florida Supreme Court declared a one-percent county-wide sales tax unconstitutional in a 4-1 vote. The "All for Transportation" sales tax was approved by Hillsborough County voters in 2018 and $400 million had already been collected but was left unspent.[9] The funds from this tax were the primary local funding source for the extension project, and thus the future of the project has been placed under review.[8][26] A new measure to replace the 2018 tax was proposed in 2022.[27] The referendum for a one percent sales tax was rejected by 2022 voters with results of 48.60% For vs. 51.40% Against.[28]

Gallery[edit]

See also[edit]

References[edit]

  1. ^ a b c d "Downtown Network Map - Downtown Network of Services" (PDF). Hillsborough Area Regional Transit (HART). 2012. Retrieved 2013-08-18.
  2. ^ a b "Transit Ridership Report First Quarter 2019" (PDF). American Public Transportation Association.
  3. ^ a b c d "TECO Line Streetcar". TECOline Streetcar. 2012. Archived from the original on 2015-09-06. Retrieved 2013-08-18.
  4. ^ "Tampa's TECO Line Streetcar System Inventing the Future. Respecting the Past" (PDF). TECO line Streetcar. Retrieved 10 December 2018.
  5. ^ "TECO Line Streetcar". tampagov.net. City of Tampa. 24 January 2019. Retrieved 26 July 2020.
  6. ^ "How Tampa Tripled Ridership on its Streetcar". Streetsblog USA. 2019-04-08. Retrieved 2019-09-13.
  7. ^ a b "Florida will contribute $67 million to extend Tampa streetcar". Tampa Bay Times. 2020.
  8. ^ a b "Tampa Streetcar Extension and Modernization - Small Starts Project Development" (PDF). United States Department of Transportation.
  9. ^ a b Holton, Jennifer (February 25, 2021). "Florida Supreme Court rejects Hillsborough County's transportation tax hike". Fox13News.
  10. ^ "Tampa's Streetcar System". Tampa Heritage. Tampa Preservation, Inc. Retrieved 15 February 2018.
  11. ^ "Tampa's Streetcar History". Soar Through History. Tampa Bay History Center. Retrieved 15 February 2018.
  12. ^ "Streetcar history clatters and dings". TECO - Tampa Electric. 26 May 2017. Retrieved 6 July 2023.
  13. ^ a b "What happened to Tampa's streetcars? An artist mapped the forgotten lines". Tampa Bay Times. Retrieved 2023-06-21.
  14. ^ "Tampa Heights, History". TampaHeights.org. Retrieved 2023-06-22.
  15. ^ "The End of the Streetcar Era in Tampa". Ybor City. Retrieved 15 February 2018.
  16. ^ "Streetcar system reaches more of downtown Tampa". Tampa Bay Business Journal. December 17, 2010. Retrieved 2011-01-24.
  17. ^ "Streetcar Vehicles" (PDF). TECO Lines. Retrieved February 14, 2023.
  18. ^ "Looking Back: The Ybor City Streetcar gets a new life (Dec. 27, 1991)". Tampa Bay Times. Retrieved March 22, 2020.
  19. ^ "Streetcar Vehicles" (PDF). TECO Line Streetcar System. Retrieved March 22, 2020.
  20. ^ "Heritage Replica Birney Trolley" (PDF). Gomaco. Retrieved February 14, 2023.
  21. ^ "Editorial: Tampa trolley gets helpful push". Tampa Bay Times. October 22, 2014. Retrieved 2014-10-25. The Tampa Port Authority's decision to withhold a subsidy from the downtown streetcar until the trolley system comes up with a stronger business plan could be a helpful turning point for this key public asset. The port should use this leverage, though, to make the trolley much more integral to the remaking of the Channel District.
  22. ^ "Streetcar fares". TECOline Streetcar System. 2018. Archived from the original on August 31, 2018. Retrieved February 17, 2019.
  23. ^ "Free streetcar rides in downtown Tampa for three years". FOX 13. 7 October 2018. Retrieved 8 October 2018.
  24. ^ Brezina-Smith, Veronica. "TECO Line Streetcar nearly triples annual ridership". bizjournals.com. Retrieved 26 July 2020.
  25. ^ "Could a streetcar linking Tampa with the airport open by 2026?". Tampa Bay Times. 2020.
  26. ^ Brezina-Smith, Veronica (March 19, 2021). "Hillsborough transit agency works to continue Streetcar expansion after surtax is rejected". Tampa Bay Business Journal.
  27. ^ King, McKenna (May 5, 2021). "Hillsborough leaders look to put new one-cent sales tax on 2022 ballot for transportation projects". ABC News.
  28. ^ "Hillsborough votes down a transportation tax as Castor returns to Congress". WUSF Public Media. 2022-11-09. Retrieved 2023-02-20.

External links[edit]