Jurong East MRT station

Coordinates: 1°20′00″N 103°44′32″E / 1.333415°N 103.742119°E / 1.333415; 103.742119
From Wikipedia, the free encyclopedia
(Redirected from Jurong East Station)


 NS1  EW24  JE5 
Jurong East
裕廊东
ஜூரோங் கிழக்கு
Mass Rapid Transit (MRT) interchange and terminus
Platform D of Jurong East
General information
Location10 Jurong East Street 12
Singapore 609690[1]
Coordinates1°20′00″N 103°44′32″E / 1.333415°N 103.742119°E / 1.333415; 103.742119
Owned byLand Transport Authority
Operated bySMRT Trains (SMRT Corporation)
Line(s)
Platforms6 (3 island platforms) + 2 (2 stacked platforms) (U/C)
Tracks4 + 2 (U/C)
ConnectionsJurong East Bus Interchange, Taxi
Construction
Structure typeElevated
Platform levels1 + 1 (U/C)
ParkingYes (Jem, Westgate)
Bicycle facilitiesYes
AccessibleYes
History
Opened5 November 1988; 35 years ago (1988-11-05) (Platforms C, D, E, F)
27 May 2011; 12 years ago (2011-05-27) (Platforms A & B)
Opening2028; 4 years' time (2028) (Jurong Region line)
ElectrifiedYes
Previous namesJurong, Jurong Town[2]
Passengers
Feb 2024136338 (Daily)
Services
Preceding station Mass Rapid Transit Following station
Terminus North–South Line Bukit Batok
Clementi
towards Pasir Ris
East–West Line Chinese Garden
towards Tuas Link
Toh Guan
towards Tengah
Jurong Region Line
Future service
Jurong Town Hall
Location
Singapore MRT/LRT system map
Singapore MRT/LRT system map
Jurong East
Jurong East station in Singapore

Jurong East MRT station is an elevated Mass Rapid Transit (MRT) interchange station on the North South (NSL) (which terminates at this station) and East West (EWL) lines in Jurong East, Singapore, operated by SMRT Trains. It is located at the heart of Jurong Lake District, within the vicinity of Jem, Westgate, IMM, Ng Teng Fong General Hospital, Jurong East Bus Interchange and the upcoming residential development J'Den, formerly JCube.

The station opened on 5 November 1988 as part of the MRT system extension to Jurong. The station was initially the terminus of the Branch line and became the terminus of the NSL after the NSL was merged with the Branch line. An additional track and platforms were added when the station went through upgrades in 2010 as part of the Jurong East Modification Project (JEMP). In 2028, Jurong East station will become an interchange with the Jurong Region Line (JRL). Jurong East station is one of the busiest MRT stations in western Singapore.

History[edit]

Aerial perspective of Jurong East Interchange and the station
Exit A of Jurong East station

The Ong Chwee Kou Building Contarctors (OCK)-Sumitomo Construction partnership was pre-qualified for contracts 403 and 404 (which involves the construction of Ulu Pandan Depot to the station and from the station to Lakeside station respectively in May 1985.[3] Originally named Jurong Town and later Jurong, it was renamed to Jurong East on 27 March 1987.[2][4] The station opened ahead of schedule on 5 November 1988, as part of the 6.4-kilometre (4.0 mi) first stage of Phase 2 of the system.[5][6][7][8][9] The station became the terminus for train services to Choa Chu Kang station when the Branch line opened on 10 March 1990[10] and later the NSL when the line was extended through Woodlands station and merged with the Branch line.[11]

Jurong East Modification Project[edit]

Exterior shot of Jurong East station taken after the JEMP.

The Jurong East Modification Project (JEMP) was a key infrastructural upgrading project involving the construction of two new platforms and a new track at Jurong East, allowing two trains along the North South Line (NSL) to enter and depart the station concurrently. Previously, trains had to take turns to arrive and depart from the station using a shared middle track. The new platforms and track allowed for improved NSL frequency between Yishun and Jurong East during weekday peak hours and reduced crowding in trains.[12] Contract 1590 for the design, construction and completion of the new above-ground platform station extension adjacent to the existing station and associated viaducts was awarded to Sato Kagyo Pte Ltd at a contract sum of S$127 million.[13]

Originally projected to open in 2012, then Minister for Transport, Mr Raymond Lim, announced on 12 February 2009 that the date was pushed forward by a year, to 2011. Construction started in 2009 and was completed and handed over to the operator at around the first quarter of 2011, with the new platforms and track being tested since then, before the announcement on 16 May 2011 about its operation date on 27 May 2011.[14][15] To connect the new train tracks to the existing tracks, train services between Joo Koon and Clementi were halted on 4 & 5 September 2010 (affected substation is Chinese Garden, Clementi and possibly Dover),[16] followed by train services between Jurong East and Bukit Gombak on 18 & 19 September 2010 (affected substation is Bukit Gombak).[17]

Initially, the new platforms and track were only operated on weekdays except public holidays, during the morning peak hour period from 7:00 am to 9:00 am. Evening peak hour operation from 5:00 pm to 8:00 pm on weekdays started from 27 December 2011 while the morning peak hour period was extended by an hour later to 10:00 am after the next batch of new trains became ready for revenue service. It was then extended progressively to between 6:00am and 11:00am, and after 5:00pm till 9:00pm.[18][19] To make full use of the new platforms, terminating NSL trains heading to Ulu Pandan Depot also use Platform A to minimize interference to through services as well as for the last train to Kranji, overnight parking of the trains were being done at Jurong East Platform A from 1:15am to 5:00am daily; the other location that was being done is at Tuas Link Platform A to minimise dispatches from depots at the start of service.

The station was retrofitted with half-height platform screen doors in 2009 which commenced operations on 18 December 2009.[20] High-volume low-speed fans were installed at the station between 2012 and 2013.[21] Noise barriers and privacy screens were installed between January 2011 and September 2014 to reduce the amount of noise generated towards residential areas. The former spans from PIE to Block 266 Toh Guan Road, and from Block 266 Toh Guan Road to Boon Lay Way and Block 108 Jurong East Street 13 to Jurong Town Hall Road in the latter.[22][23]

Jurong Region Line interchange[edit]

On 9 May 2018, LTA announced that Jurong East station would be part of the proposed Jurong Region line (JRL). The station will be constructed as part of Phase 2, JRL (East), consisting of 7 stations between Tengah and Pandan Reservoir, and is expected to be completed in 2028.[24]

Contract J110 for the design and construction of Jurong East JRL station and associated viaducts, including addition & alteration works to the existing station complex, was awarded to Daelim Industrial Co. Ltd at a sum of S$197.4 million. Construction started in 2020, and is planned to be completed in 2028.[25][26][27]

To facilitate the construction of the JRL station, the existing Jurong East Bus Interchange was relocated from 6 December 2020 to a temporary interchange built opposite the current site. To allow better accessibility and convenience for commuters, a sheltered pedestrian bridge was built to connect the MRT station to the temporary bus interchange. The temporary interchange is to operate until 2027 when the Jurong East Integrated Transport Hub is to be completed.[28][29][30]

Initially expected to open in 2027, restrictions imposed on construction due to the COVID-19 pandemic have led to delays in the JRL line completion, and the date was pushed to 2028.[31]

Station overview[edit]

The station was designed by Scott Danielson, and it has a roof which utilises a geometric design similar to the original Jurong East Bus Interchange, in order to fit with the adjacent structure.[32]

The station currently has four tracks and three island platforms serving both the North South and East West lines. It is the terminus for the North South line. To the southeast, the tracks merge into two tracks, while to the northwest the tracks widen into six tracks, four of which are for the North South line. The four tracks later merge into two.[33] As part of the JEMP, a new platform was built to allow two trains along the North South Line to enter and depart the station at the same time. Previously, trains had to take turns to arrive and depart from the station using a shared middle track, which has been overcrowded during peak hours.[34][14] Currently, the new platforms A and B are only opened on weekdays (except public holidays) during morning and evening peak hours.[18]

References[edit]

  1. ^ "Jurong East (MRT Station) - 10 Jurong East Street 12 (S)609690". www.streetdirectory.com. Archived from the original on 25 August 2018. Retrieved 9 May 2020.
  2. ^ a b "Name change for five MRT stations". The Business Times. 27 March 1982. Archived from the original on 25 September 2020.
  3. ^ "MRTC prequalifies 37 for 11 engineering contracts". The Business Times. 13 May 1985. Archived from the original on 25 September 2020.
  4. ^ "A Journey Into Singapore's MRT past". 23 July 2013. Archived from the original on 28 July 2017. Retrieved 21 December 2017.
  5. ^ "Jurong line ready by end of this year". The Straits Times. 12 March 1988. Archived from the original on 25 September 2020.
  6. ^ "Destination: Jurong". The Straits Times. 5 November 1988. Archived from the original on 22 January 2023. Retrieved 9 May 2020.
  7. ^ "NOV 5: The MRT arrvies early at Jurong". The New Paper. 30 August 1988. Archived from the original on 25 September 2020.
  8. ^ "MRT to Jurong today". The New Paper. 5 November 1988. Archived from the original on 22 January 2023. Retrieved 9 May 2020.
  9. ^ "Three more stations for MRT system". The Business Times. 5 November 1988. Archived from the original on 20 October 2017. Retrieved 20 October 2017 – via NewspaperSG.
  10. ^ "MRT to Bt Batok, Bt Gombak and Choa Chu Kang on Mar 10". The Straits Times. 14 February 1990. p. 3.
  11. ^ "Better layouts for six new MRT stations". The Straits Times. 19 November 1992.
  12. ^ "The Jurong East Modification Project (JEMP)". Archived from the original on 27 May 2011.
  13. ^ "C1590 – Jurong East Modification Project, Singapore – YWL Engineering". Archived from the original on 18 April 2019. Retrieved 9 May 2020.
  14. ^ a b "New Platform at Jurong East Station To Open on 27 May". www.lta.gov.sg. Archived from the original on 7 August 2011.
  15. ^ "Waiting times cut with new platform at Jurong East MRT station". Channel NewsAsia. Archived from the original on 18 May 2011. Retrieved 17 May 2011.
  16. ^ "Temporary MRT service disruption". Archived from the original on 10 August 2017. Retrieved 10 August 2017.
  17. ^ "LTA and SMRT gear up for disruption over the weekend". www.lta.gov.sg. Archived from the original on 10 August 2017. Retrieved 10 August 2017.
  18. ^ a b "New platforms at Jurong East Interchange to operate in evenings". Channel NewsAsia. Archived from the original on 8 January 2012. Retrieved 23 December 2011.
  19. ^ Jamie Ee Wen Wei (28 May 2011). "Jurong East platform opens". The Straits Times.
  20. ^ "Speech By Mr Raymond Lim At The Visit To Kim Chuan Depot on 25 January 2008". www.mot.gov.sg. Retrieved 11 August 2021.[permanent dead link]
  21. ^ "Enhancing Connectivity and Comfort for Commuters". www.lta.gov.sg. Land Transport Authority. 13 October 2011. Archived from the original on 25 December 2012. Retrieved 6 July 2012.
  22. ^ Mustafa Shafawi (14 June 2011). "LTA to study noise levels along elevated MRT tracks". Channel News Asia.
  23. ^ "Railway Noise Barriers on Track". www.lta.gov.sg. Archived from the original on 1 December 2017. Retrieved 22 November 2017.
  24. ^ "Joint News Release by the Land Transport Authority (LTA) & SLA - Jurong Region Line: Enhancing Connectivity in the West | Press Room | Land Transport Authority". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
  25. ^ "LTA | News Room | news-releases | LTA Awards Three Civil Contracts to Construct Four Stations for the Jurong Region Line". 13 February 2020. Archived from the original on 13 February 2020. Retrieved 13 February 2020.
  26. ^ "LTA awards 3 contracts for future Jurong Region Line worth S$596m, Transport - THE BUSINESS TIMES". 13 February 2020. Archived from the original on 13 February 2020. Retrieved 13 February 2020.
  27. ^ Yi, Wong Kai (13 February 2020). "3 civil contracts worth $596m awarded to design, construct future Jurong Region Line stations, Transport News & Top Stories - The Straits Times". The Straits Times. Archived from the original on 13 February 2020. Retrieved 13 February 2020.
  28. ^ "LTA | Relocation of Jurong East Bus Interchange from 6 December 2020". www.lta.gov.sg. Retrieved 25 April 2023.
  29. ^ Tan, Christopher (11 November 2020). "Jurong East bus interchange to be relocated from Dec 6 till 2027". The Straits Times. Archived from the original on 22 January 2021. Retrieved 26 November 2020.
  30. ^ "Jurong East bus interchange to be relocated from Dec 6". CNA. 11 November 2020. Archived from the original on 22 January 2023. Retrieved 26 November 2020.
  31. ^ "Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Prioritising Early Completion of Jurong Region MRT Line". www.mot.gov.sg. 1 February 2021. Archived from the original on 19 February 2021. Retrieved 24 March 2021.
  32. ^ "MRT station roofs to show Singapore's cultural mix". The Straits Times. 13 April 1987. Archived from the original on 20 October 2017. Retrieved 29 October 2017 – via NewspaperSG.
  33. ^ "Jurong East MRT station" (Map). OpenStreetMap. 28 March 2020. Retrieved 28 March 2020.
  34. ^ "New Platform at Jurong East MRT Station". Archived from the original on 9 July 2011.

External links[edit]